BC Strata Reserve Health Calculator
Does the current reserve and planned contribution support the stated capital-work horizon?
A contingency reserve balance alone does not establish strata health. Compare the latest balance after approved commitments, the dated work plan, expected contributions, and the applicable allocation method before treating a funding gap as a future special levy.
Funding context—not a levy prediction.
Use this to test whether dated funding assumptions cover a defined planning horizon.
Method, sources, and limits
Rules version: bc-property-rules-2026-08-11. Reviewed 2026-08-11. Results are deterministic estimates in Canadian dollars.
- Province of BC — Contingency reserve fund ↗
- Province of BC — Special levies in stratas ↗
- Strata Property Act — Form B information ↗
This tool does not determine eligibility, approval, coverage, legal responsibility, engineering condition, or future cost. Confirm time-sensitive or property-specific results with the professional responsible for that work.
Keep the assumptions beside the calculation.
This model applies only the amounts and horizon you enter. It does not decide whether work is needed, approve reserve use, update a depreciation report, determine a valid allocation method, or predict a special levy, vote, loan, insurance claim, or price adjustment.
Read the source-backed guide →Use the result with the right boundary.
Does a large contingency reserve fund mean a strata is healthy?
No. The balance needs context: approved commitments, planned work, report assumptions, annual contributions, actual condition, insurance, and how costs are allocated.
Does an unfunded planning gap prove there will be a special levy?
No. A gap is a question for the strata file. Actual funding can change through updated scopes, reserve use, contributions, borrowing, insurance, owner votes, or work timing.